UK National Waste Policy – A Bridge Half Built: A Zero Waste Alliance Declaration

Submission to the Environment, Food & Rural Affairs Committee to examine Waste Strategy for England November, 2008

[PDF version at: http://www.zwallianceuk.org/html/declaration.pdf]

Zero Waste Alliance UK is a company registered by guarantee in England & Wales, company number 04452297, charity registered number 1122168 www.zwallianceuk.org

UK National Waste Policy - A Bridge Half Built
In July 2002 the Zero Waste Charter was launched at the House of Commons, and has since received wide national and international backing. It argued that there was a growing environmental imperative for the reduction, recycling and composting of waste to reduce:

the dangers to human health of incinerators and landfills
CO2 emissions
the pressure on virgin forests, on minerals and on rapidly degrading soils.

The 10 point charter set out a strategy for moving to Zero Waste in the UK, notably by:

maximising the recycling of dustbin and of bulky waste
introducing the doorstep collection of organic waste and a composting infrastructure banning the thermal treatment of mixed waste and the landfilling of untreated biological waste limiting waste disposal authorities to 10 year contracts to ensure flexible facilities to complement the growth of recycling and composting introducing a disposal tax and ear-marking its proceeds to promote Zero Waste.
accelerating and extending producer responsibility legislation

After the launch of the Charter, the Government’s Strategy Unit supported many of the principles of the Charter. It led to a radical increase in the landfill tax. It supported increased rates of recycling and composting, secured additional funding for WRAP to engage in waste prevention and recycling, and for the first time recommended Mechanical and Biological treatment as an alternative to incineration and landfill as a means of handling residual waste.

But it left a bridge half built. And policy has in the meantime slipped back to its previous groove: timid on targets, and a promoter of incineration.

Climate change will not be countered by limited ambition. Leading countries and regions in Europe are now recycling and composting 60% of their municipal waste. The UK remains a straggler. Recycling has doubled in four years, but still stands at no more than 23.5% in 2004/5. DEFRA’s current review proposes a maximum target of 50% by 2020, a level that the best UK authority is already meeting. This sets the bar too low. It offers too little too late.

Holding back recycling and composting and promoting incineration will not reduce CO2 emissions. Yet this has been the consistent thread of Government policy since the Strategy Unit Review:

The UK government is notorious in Europe for its opposition to the EU Bio waste directive, and has had it shelved . The UK Animal By-Products Regulations have set levels of treatment way beyond those operating in the rest of the EU, raising the cost and discouraging the composting of domestic and commercial food waste.

The Government is pressing the EU Commission to redefine incineration as recovery rather than disposal

Funds for PFI waste disposal contracts have been increased, encouraging large scale, capital intensive disposal technologies and 20-25 year contracts and reducing the incentive to maximise recycling1

In proposing long term national targets for incineration, but only modest short term recycling and composting targets for individual local authorities (a maximum of 30% for 2007/8) Government encourages disposal authorities to crowd out recycling and composting by the construction of large scale incinerators.

The escalating landfill tax coupled with LATS, without graduated taxes on other forms of disposal, encourages a switch from landfill to other disposal options rather than the maximisation of recycling and composting.

DEFRA has substituted a tick box sustainability appraisal for the Best Practical Environmental Option, which has facilitated proposals for incineration at public enquiries. In spite of massive local opposition the DTI has approved the proposal for a giant incinerator at Belvedere in East London (up to 800,000 tonnes, making it the largest incinerator in Europe), so creating a long term appetite for paper and plastic from Greater London, that should be recycled to save CO2 emissions. Belvedere’s approval sets a precedent for giant schemes throughout the country.

DEFRA’s current Review is strong on the rhetoric of recycling, but it fails to will the means. It remains a charter for incineration not for Zero Waste. It argues for incineration as a means of countering climate change on two grounds: that it replaces methane producing landfill, and that it substitutes carbon neutral electricity production for fossil fuel power stations. 2

But it under-estimates:

The loss of stored up energy embodied in recyclable materials prematurely incinerated (notably paper, aluminium, organic waste and plastic).

And it takes no account of:

the capture of methane from landfill, which at the high rates assumed elsewhere by DEFRA makes landfill broadly comparable in terms of net CO2 emissions to electricity-only incineration.3

the fact that electricity-only incinerators generate4 more fossil CO2 than gas fired power stations and more in total than coal power stations, while CHP or heat only incinerators are only marginally better than gas fired stations even if the heat is put to good use - not always possible even in areas like Scandinavia where the demand for heat is higher than in the UK5

the sequestration of carbon in depleting soils through the application of compost, or stabilised residues from MBT plants.

the lifecycle energy costs involved (and the waste generated) in the production of the incinerators themselves

Incinerators are producers of brown energy not green. They do not reduce green house gas emissions but increase them, both because of the overall CO2 emissions at their strikingly low current levels of efficiency of 25% or less, and because their destruction of the ‘grey energy’ embodied in the materials they burn increases the need for new energy intensive virgin materials.

The incentive structure and the process of decisions on disposal of waste are tilted towards incineration. Whereas stabilised residues from MBT that are landfilled are subject to the full landfill tax, bottom ash from incinerators is classed as inert, and charged only £2 a tonne.

Far from facing a graduated tax as a means of disposal, incinerators receive more Government funding, and have greater access to private finance, than recycling or composting. Accordingly they remain the technologies of choice for disposal authorities which the Government have left with the decisive institutional power in municipal waste management.6

Even where, because of public opposition, disposal authorities have fought shy of incineration or its modern variants pyrolysis and gasification, they have continued to negotiate 20-25 year inflexible contracts, incorporating Mechanical and Biological Treatment (MBT) plants, that produce ‘refusederived fuel’ as a feedstock. They have made MBT, a potentially more flexiblemeans of stabilising residual organic waste and suitable for the transition to Zero Waste, into a processing arm for incineration, and a barrier rather than a support to Zero Waste strategies.

Zero Waste Alliance Proposals

Zero Waste policies have had to swim against the institutional and policy tide, rather than being carried along by it. The Zero Waste Alliance therefore urges the Government and local authorities to re-orient their policies in the direction of Zero Waste, in line with leading regional and national governments overseas, and further to the 10 points of the original charter, adopt the following specific measures:

1. Set long term recycling and composting targets of 75% for all local authorities by 2015, (and a minimum of 60% for each individual local authority) along with waste minimisation targets, to prevent their crowding out by local and regional long term disposal contracts.

2. Press the EU to introduce the Biowaste Directive, and its requirement for kerbside kitchen waste collections in all cities, towns and villages with over 1,500 population.

3. Switch the government subsidy of PFI schemes to the start up costs of food waste collection and composting, as part of the Treasury’s forthcoming Comprehensive Spending Review.

4. Extend the grant of carbon credits to recycling and composting to reflect their impact on the reduction of CO2 emissions generated by the production of virgin materials.

5. Extend Producer Responsibility Legislation to cover all materials in the household waste stream, and raise the targets for recycling of plastic packaging, glass and metals under existing legislation to those set by the leading countries in Europe.

6. Recognise incineration as disposal not recovery, in line with the EU Waste Framework Directive and rulings of the European Court of Justice.

7. Fund a major research programme to identify the hazards of nano particles, particulate aerosols, and brominated flame retardants that arise from the burning of mixed waste.

8. Introduce an incineration tax of at least £12 per tonne.

9. Charge incinerator bottom ash at the full level of landfill tax (rather than the £2 a tonne which it currently enjoys by virtue of its unwarranted classification as inert waste) and reduce the landfill tax to £6 a tonne for bio-degradable waste, stabilised to the levels set out in the 2nd draft of the Biowaste Directive.

10. Require compulsory insurance against future pollution and health claims for all disposal and recovery facilities.

The past four years have not been wasted. The ground for a radical increase in recycling and composting is now prepared. St Edmundsbury has become the first council to pass the 50% recycling and composting target. The leading continental and North American authorities are now reaching 75%. They mark the path to Zero Waste.

The imperative of climate change has, too, at last been unequivocally recognised by scientists, by the media and now by all major political parties. But it is not reflected in waste policy. In spite of the evidence that recycling and composting lead to major CO2 savings relative to incineration and landfill - WRAP estimates the savings of current levels of recycling and composting at 10-15 million tonnes of carbon equivalent per year7 and in spite of its higher CO2 emissions relative to gas fired electricity generation, the Government is still promoting incineration as a source of green energy.

What is required is return to the boldness of the Strategy Unit’s policy, and a shift of finance and incentives towards composting and recycling. Climate Change policy calls for it. The Government should respect the evidence, free itself from the disposal centred waste industry, and complete the work that was left half finished after the Strategy Unit’s Review.

The Zero Waste Alliance
Zero Waste Charter
The organisations, groups and individuals who have signed this charter are committed to achieving Zero Waste in Britain by 2020. Zero Waste is a new concept being pioneered by leading corporations, municipalities, and now provincial and national governments. It entails re-designing products and changing the way waste is handled so that products last longer, materials are recycled, or, in the case of organics, composted. Waste is in the process of being designed away.

The immediate imperatives behind the drive for Zero Waste are environmental. There is a new awareness of the dangers to human health of waste landfills and incinerators. Landfills are major producers of methane, and polluters of water tables. Incinerators produce greenhouse gases, and are a source of heavy metals, particulates and dioxins.

Zero Waste strikes at the cause of this pollution. It also lightens the ever growing pressure on the world’s forests, soils, and mineral resources by making more with less. Doubling the life of a car saves the 15 tonnes of materials required to make a new one. Recycling paper gives wood fibres six lives rather than one. Increasing the productivity of resources in this way also leads to major savings in energy. Zero Waste will play a central role in cutting CO2 emissions
and sequestering carbon in the soil.

There is a further economic dividend. Redesigning production and increasing recycling to eliminate waste is stimulating a green industrial revolution. New materials and growth industries are emerging, together with a growth in jobs. In Germany recycling already employs more people than telecommunications. In the US, it has overtaken the auto industry in direct jobs. Governments that embarked on policies to reduce waste in order to combat pollution and climate change, are now realising that zero waste is a key element in any post industrial economic strategy.

Municipalities and companies overseas are well on their way to zero waste. They have shown that it is possible to recycle and compost 70% or more of their waste streams with existing product design. Residual materials which are hazardous, or are costly to recycle can then be phased out and replaced by new clean materials that can be returned to use efficiently and effectively.

Increasing numbers of cities and states have adopted the goal of Zero Waste, including Canberra, Toronto, the state of California, and most recently the Government of New Zealand. This charter seeks to extend these pioneering practices to all the municipalities and producers in the UK.

Our starting point is to create zero waste areas where we live and work – in our streets, and villages, in our schools and hospitals, in municipalities and our many different workplaces. We invite local communities, elected councils at every level, and our major institutions and corporations to sign up to these goals, to put in place7 measures to reduce their waste, and to expand recycling and composting with the goal of achieving Zero Waste by 2020.

By ourselves we can only go so far. The current waste regime still favours disposal over recycling. The Government must change this. Many products are difficult or too hazardous to recycle. The Government can change this, too, by making the manufacturers who produce them responsible for the waste that results, and for redesigning products so that they are safe, long lasting and can be easily recycled. We call on the Governments of Britain, Wales, Scotland and Northern Ireland to end a decade of policy timidity and give a lead to the promotion of Zero Waste by adopting the following 10 point plan to transform Britain’s waste economy:

1. Set a target of Zero Waste for all municipal waste in Britain by 2020 (50% by
2010 and 75% by 2015).
2. Extend the doorstep collection of dry recyclables to every home in Britain without
delay
3. Provide doorstep collection of organic waste, and establish a network of local
closed vessel compost plants.
4. Convert civic amenity sites into re-use and recycling centres.
5. Ban from 2006 the landfilling of biological waste which has not been treated and
neutralised.
6. Ban any new thermal treatment of mixed waste and limit disposal contracts to a
maximum of ten years.
7. Extend the Landfill Tax into a disposal tax. Increase its level, and use it to fund
the Zero Waste programmes.
8. Extend Producer Responsibility legislation to all products and materials that are
hazardous or difficult to recycle.
9. Open up waste planning to greater public participation and end the commercial
confidentiality of waste contracts.
10. Establish a Zero Waste Agency to promote resource efficiency and act as a
guardian of public health.
Signed:

1 The National Audit Office report notes that PFI deals take longer to bring to financial close than other types of procurement, and that after nine years, only six residual waste plants are in place or under construction.
2 Defra (2006) Review of England’s Waste Strategy: A Consultation Document, February 2006. Its wording is: “EfW reduces emissions of greenhouse gases in two ways: because the wastes could otherwise go to landfill and generate methane; and because emissions from the biomass fraction of the waste, which are carbon-neutral, are likely to replace those from fossil generation.” p.60
3 Eunomia, A Changing Climate for Energy from Waste, Friends of the Earth, May 2006.
4 Eunomia, op. cit. By 2020 forecast advances in power station technology and the growing proportion of plastic in residual waste means that energy only incinerators will emit twice the fossil CO2 of gas power stations, and probably more than new or refitted coal power stations using up to 20% biomass. Wastes contain both fossil carbon derived from oil and other fossil fuels and biogenic carbon from wood and plants. When biogenic carbon and time are included in the analysis, energy from waste incineration – where only electricity is generated – looks like a mediocre performer (Eunomia 5.2). Indeed, if the residual waste is landfilled after the stabilising treatment now required, it is only marginally better than landfilling. The Eunomia report contains a valuable critique of the ERM Report for DEFRA that has been used to justify the Government’s incinerator policy, see pp.74 sq. and ERM (2006) Impact from Energy from Waste and Recycling Policy on UK Greenhouse Emissions, Final Report for Defra, January 2006
5. Eunomia, p6
7WRAP, Environmental Benefits of Recycling. An international review of life cycle comparisons for key materials in the UK recycling sector, May 2006. The study was based on a comparative review of 55 international life cycle studies, assessing 200 scenarios.

Veolia at the image laundry



Large companies love greenwash and it seems there's always someone waiting to oblige. In 2006, Veolia ES Hampshire, which operates 3 incinerators, was given a 'Green Hero' award by The Green Organisation, a company whose main function appears to be as an image-laundry for large companies: http://www.sourcewatch.org/index.php?title=Green_Apple_Environment_Awards.

'Green Apple Awards' are given to a variety of projects, some genuinely 'green' and some rather less-so. More 'prestigious' initiatives/companies (like, er, Veolia) get 'Green Hero' status.

Veolia is in good company: Green Apple/Hero awards have been awarded to EDF Energy, DHL, Bovis, Defra, McAlpine, Tesco and many other luminaries of green practice.

Even the Barnstaple Western Bypass (that's the actual bypass) got one, despite being bitterly opposed by local green campaigners in Friends of the Earth and the Green Party for its destruction of natural habitats and encouragement of car-use etc: http://news.bbc.co.uk/1/hi/england/devon/3117587.stm http://news.bbc.co.uk/1/hi/england/devon/3999003.stm

The Green Organisation also owns Live Earth a company about which there is even less information than its 'parent'. Multi-millionaire owner of the Green Organisation, Jan Telensky, received a Live Earth Award for his own tourist development - AquaCity - a resort in Slovakia. http://jtcompanynews.blogspot.com/2008/06/worlds-leading-green-resort-achieves.html

Winners of the Gold Green Apple in 2008 win a free holiday in...................AquaCity, which is described as 'conveniently positioned within just 8 minutes of Poprad international airport, AquaCity is also just 15 minutes' drive of the dramatic High Tatras Mountains.'

We hope that Green Apple winners are at least offered the green travel option: 'AquaCity is less than ten minutes' walk from Poprad mainline station, with good and inexpensive rail links to main towns and cities throughout Slovakia, including the capital, Bratislava and over the mountains into Poland, to link with Krakow.'

A 'cathedral' for Shrewsbury?

Those people who long for Shrewsbury to achieve city status may get their wish - if Veolia gets its way to build a 'Cathedral of Incineration' at Battlefield.

http://www.veoliaenvironmentalservices.co.uk/hampshire/pages/pdfs/Waste_Watch_20.pdf

THE PORTSMOUTH INCINERATOR: 'The site was highly praised for its elegant design and materials by judge, reporter and architecture critic Tom Dyckoff who said: "This cathedral of incineration has a style of industrial, almost minimalist chic. It's an incinerator that isn't an eyesore."'

As you can see, from the image of the Portsmouth incinerator, below, such a 'cathedral' could knock spots off Battlefield Church and Shrewsbury Abbey......


Do you see a field? Perhaps near a 15th-century national heritage site and upwind of growing crops and 100s of Shropshire families?

FROM 'THE ECOLOGIST MAGAZINE, FEBRUARY 2008' (Their version of Veolia's glossy ad. campaign!)

'Do you see a field? We see the opportunity to add to our fleet of six incinerators, which pump dioxins, greenhouse gases and heavy metals across local communities.
By tying Nottinghamshire Council into a 25-year waste contract we landed it with a National Audit Office Inquiry over the use of public funds. In 2006, we topped-up our Hampshire incinerator with waste from people's recycling boxes. In March 2007, we tried to dig a landfill above a major aquifer in West Sussex and in July we were fined for preparing to dump highly flammable liquids into a landfill full of hazardous waste.

The environment is an industrial challenge - VEOLIA'

Dr Dick Van Steenis on YouTube - interview 21.10 08 in Sherifhales near Telford

Click on the title of this post (in blue, above) to visit the Telford PAIN anti-incineration site and watch a short YouTube video of Dr Dick Van Steenis being interviewed by PAIN on 21 October. He spells out the lethal effects of incineration and also points out the links between Shrewsbury environmental consultants Enviros and the incineration industry. He also urges people to contact their local Primary Care Trust and demand that independent Health Impact Assessments of the 2 proposed Shropshire incinerators be done before the planning hearings.

Watch the video, then write to:

Dr Isabel Gillis, Director of Public Health
Shropshire County PCT
William Farr HouseMytton Oak Road
SHREWSBURYSY3 8XL

Tel: (01743) 261300
Fax: (01743) 261303
isabel.gillis@shropshirepct.nhs.uk

and tell her of your concerns about the health effects of incinerators. Tell Dr. Gillis that public safety requires the PCT to carry out a rigorous Health Impact Assessment of the proposed incinerators at Battlefield, Shrewsbury and at Granville, Telford.

A case to answer

Studies showing links between incinerators and infant mortality must be addressed by elected representatives and health officials.

In 2004, a Japanese study of 63 incinerators (see note 1, below) and a 2007 Italian study of 27 incinerators (see note 2, below) have both found elevated infant mortality rates around incinerators.

The first sentence of the conclusion in the Japanese study states: "Our study shows a peak-decline in risk with distance from the municipal solid waste incinerators for infant deaths and infant deaths with all congenital malformations combined."

The conclusion of the Italian study is: "Findings call for further insight by analytic epidemiologic studies to confirm possible association between infant mortality and living near incinerators."

Michael Ryan, a researcher from Shrewsbury has examined infant mortality rates at electoral ward level around twenty-eight incinerators and has consistently found high rates in wards which are exposed to PM2.5 emissions from such plants.

A map showing high infant mortality in wards associated with the Bernard Road incinerator at Sheffield can be found at: http://www.ukhr.org/incineration/sheffieldincinerator.pdf

Pooled 2004-2006 infant mortality data for electoral wards in Bolton.
Bolton has two incinerators: The White Rose incinerator at Bolton General Infirmary burns clinical & radioactive waste:

Astley Bridge; 472 live births; 4 infant deaths; 8.5 per 1,000 live births
Bradshaw; 363; 3; 8.3
Breightmet; 533; 5; 9.4
Bromley Cross; 326; 2; 6.1
Crompton; 785; 9; 11.5
Farnworth; 749; 4; 5.3
Great Lever; 901; 14; 15.5 [Municipal incinerator, Raikes Lane]
Halliwell; 639; 5; 7.8
Harper Green; 611; 3; 4.9 [White Rose incinerator at Bolton General Infirmary]
Heaton & Lostock; 334; 1; 3.0
Horwich & Blackrod; 408; 1; 2.5
Horwich North East335; Nil; 0.0
Hulton; 488; 3; 6.1
Kearsley; 496; 2; 4.0
Little Lever & Darcy Lever; 397; 1; 2.5
Rumworth; 860; 4; 4.7
Smithills; 490; 1; 2.0 T
onge with the Haulgh; 519; 4; 7.7
West Haughton North & Chew Moor; 394; Nil; 0.0
West Houghton South; 523; 4; 7.6

Bolton in 2004: 3402 live births, 20 infant deaths; 5.9 per 1,000 live births
Bolton in 2005: 3576 live births, 24 infant deaths; 6.7 per 1,000
Bolton in 2006: 3645 live births, 27 infant deaths; 7.4 per 1,000

Mr Ryan has discovered that the 2002-2006 infant mortality rate in his ward [Bowbrook, where there is a hospital incinerator] is 14.7 per 1,000 live births. An incinerator is planned for north Shrewsbury and elected officials, officers, the incineration companies and supposedly independent environmental consultancies consistently refuse to engage with Mr Ryan’s research into adverse health effects.

Mr Ryan attributes the deaths of two of his four children to the adverse effects of living near an incinerator. He has been carrying out this research to help prevent further loss of life.

Note 1 J Epidemiol. 2004 May;14(3):83-93.Risk of adverse reproductive outcomes associated with proximity to municipal solid waste incinerators with high dioxin emission levels in Japan. Tango T, Fujita T, Tanihata T, Minowa M, Doi Y, Kato N, Kunikane S, Uchiyama I, Tanaka M, Uehata T.
Department of Technology Assessment and Biostatistics, National Institute of Public Health, Wako, Saitama, Japan.


Note 2 Epidemiology: Volume 18(5) SupplSeptember 2007p S125 Infant Mortality in 27 Italian Municipalities With Solid Waste Incinerators (1981-2001) [ISEE 2007 CONFERENCE ABSTRACTS SUPPLEMENT: Abstracts] Bianchi, F; Minichilli, F; Pierini, A; Linzalone, N; Rial, M CNR National Research Council, Institute of Clinical Physiology, Epidemiology Unit, Pisa, Italy.

UN threatens to act against Britain for failure to protect Battlefield (well why not?)


Unesco may put buildings on endangered list
New legislation to address concerns, say ministers
Severin Carrell, Scotland correspondent The Guardian,
Monday September 8 2008

Stonehenge
The UN is threatening to put the Tower of London on its list of world heritage sites in danger after its experts accused the UK of damaging globally significant sites such as Stonehenge, the old town of Edinburgh and the Georgian centre of Bath, the Guardian has learned.
Unesco, the UN's cultural agency, has told ministers in London and Edinburgh that it wants urgent action to protect seven world heritage sites which it claims are in danger from building developments, and said in some cases the UK is ignoring its legal obligations to protect them.
Their complaints range from decisions to approve new tower blocks in central London, such as the 66-storey "shard of glass" at London Bridge, to the failure to relocate the A344 beside Stonehenge despite promising action for 22 years, to a proposed wind farm which threatens neolithic sites on Orkney.

'UK is too keen on prestige development'
For all seven sites, it has asked the UK to write detailed progress reports replying to its concerns by February.
Unesco's world heritage centre in Paris is also sending two teams of inspectors to Edinburgh and Bath this winter to investigate its concerns that new buildings in both cities will damage their "integrity" and their "outstanding universal value."
In its strongest criticism, Unesco's world heritage committee has said it "deeply regrets" the decision by Edinburgh city council to press ahead with a hotel, housing and offices development called Caltongate next to the Royal Mile, despite expert evidence it will ruin the medieval old town's unique form.
In the committee's final report after its annual meeting in July in Quebec, which has just been released, it also accuses the UK of breaching world heritage site guidelines by failing to warn it in advance about the Caltongate scheme. Last month, Koichiro Matsuura, Unesco's director general, told the Scotsman there was growing concern about Edinburgh. "It is crucial that its outstanding features are preserved and protected," he said.
Leading architects and conservationists, including Sir Terry Farrell and Marcus Binney, chairman of Save Britain's Heritage, have said they share Unesco's anxieties. Farrell, appointed Edinburgh's "design champion", told the Guardian the city urgently needed a proper urban design masterplan. "I'm very supportive of Unesco's position," he said.
Binney said: "Heritage has taken a back seat to Cool Britannia and encouraging everything modern, and we're now uncomfortably in the limelight for failing to have proper policies to protect our world heritage sites, and timely criticisms are now being made."
In potentially its most serious conflict with ministers, Unesco has said it could put the Tower of London on its "world heritage in danger" list next year if ministers fail to honour promises to strengthen planning guidelines for the area.
Unesco is worried that the "iconic" Norman Tower and its 13th-century walls will be overshadowed by Renzo Piano's London Bridge tower, the so-called "shard of glass", and a 39-floor tower on Fenchurch Street in the City. It accepts that a new management plan for the area is being drafted but is angry that the new towers are still being approved.
The Department for Culture, Media and Sport, which has lead responsibility for protecting the UK's 27 world heritage sites, says it is introducing a heritage protection bill which will give all sites in England the same legal protection as a conservation area.
It said its delegation to the Quebec meeting had successfully challenged some criticism from Unesco by showing that planners were acting to draft guidelines on protecting several sites and their skylines. "The tone of the meeting was very positive and our delegates came away with a very positive feeling about the likely final outcome," it said. "Nothing has been said or received subsequently to alter this impression."
The UK overturned a proposed warning that the Palace of Westminster world heritage site, which includes the abbey and St Margaret's church, could also be added to the "in danger" list next year if Unesco's concerns were ignored, by citing the heritage protection bill and planning guidelines. But Unesco still "regrets" that the UK has failed to put in a "buffer zone" to restrict damaging developments and draw up a proper "skyline study" to allow planners to rapidly assess development proposals. It accuses the UK of a "lack of clarity" in assessing the conflicts between conservation and development.
Of the seven sites examined by Unesco, Liverpool had the greatest success: the city council was praised for acting on Unesco's fears about the damage to its Georgian buildings from building plans.
In advance of the inspectors' visit to Bath, DCMS officials have said they are "extremely concerned" about the accuracy of claims in Unesco's report about the damage that could be caused by proposals for seven-storey flats and a college to its Georgian centre.
John Graham, chief executive of Historic Scotland, said he shared Unesco's anxieties about plans for high rises in Edinburgh's Leith docks and a tower to replace the St James' centre, a 70s concrete shopping centre in the New Town due for demolition.
But he had no fears about the Unesco inspectors' visit in November.
"The judgments we've reached are sound and defensible; that is the stance we will be taking when the mission arrives," he said.

Heritage sites under threat:
Stonehenge and Avebury
Site
The neolithic stone circle and avenues, and the associated megalith circles at Avebury, were listed in 1986.
Problem A cause of anxiety for 22 years, Unesco is angry that plans to reroute the A344 with a tunnel and build an offsite visitors' centre have again been scrapped. It "regrets" the continued delays and "urges" ministers to act quickly.
[Battlefield, Shrewsbury
Site Site of the Battle of Shrewsbury and historic Battlefield Church
Problem A 90,000-ton proposed incinerator as part of a planned 27-year waste contract between Shropshire County Council and the waste company Veolia. The incinerator would visually obliterate the site and would inundate it with toxic chemicals every time there is a temperature inversion or a SW (prevailing) wind] added by Safe Waste Shropshire!]
Neolithic ruins, Orkney
Site Skara Brae, Maeshowe and the Ring of Brodgar were among the ancient sites listed in 1999.
Problem Three planned wind turbines will be visible and Unesco wants the project stopped. Historic Scotland agrees they will damage it. A public inquiry will report soon.
Edinburgh
Site The "remarkable" medieval Old Town and Georgian New Town of central Edinburgh were listed in 1995.
Problem Unesco fears several building projects in the city centre and Leith docks will damage the site's architectural heritage. It "deeply regrets" the city has approved a hotel, office and housing complex by the Royal Mile, and is sending inspectors to visit.
Bath
Site The city's grand neo-classical Georgian crescents, terraces and squares were listed in 1987.
Problem Unesco fears plans to build 2,000 flats in buildings up to nine storeys, and an engineering school sponsored by James Dyson, will damage the site's setting. It is sending inspectors and wants the schemes blocked until its committee has studied the plans.
Liverpool
Site Its maritime mercantile city, with its churches and Georgian warehouses, was listed in 2004.
Problem Unesco is happy the city swiftly acted on concerns that a new museum, a 24-storey tower and a new conference centre threatened the site's setting and integrity. Unesco wants further action to protect it.
Westminster, London
Site The Palace of Westminster, Westminster Abbey and St Margaret's Church were listed in 1987.
Problem Unesco believes several new tower blocks, including the 170-metre Beetham tower in Southwark and a 144m tower at Doon Street, will affect the site. It is annoyed its demands for a buffer zone and a detailed study of the skyline have been ignored.
Tower of London
Site
The Norman tower and its 13th-century walls were listed in 1988.
Problem New buildings, such as the 66-storey "shard of glass" tower and a 39-floor tower at Fenchurch Street, will dominate the skyline. Unesco "regrets" the UK has failed to implement a robust buffer zone or an effective local plan. It is threatening to put the tower on its "world heritage in danger" list.